Grid Apex builds the facility. You bring the compute. From warm-shell leasing to modular deployment and green energy — every solution is engineered for the extreme demands of next-generation AI workloads.

Our Core Competency

We combine deep local expertise with world-class engineering — delivering a platform that removes the most critical barriers to large-scale AI deployment in Japan.

Pillar 01 / Energy & Land

Deep Root in Japan's Energy and Real Estate Industries

⚡ TEPCO & Chubu Relations 🗾 Land Rezoning & Permits 🔌 Substation Interconnection

Grid Apex is built on long-standing relationships with Japan's leading power utilities — including TEPCO and Chubu Electric Power — as well as regional landowners, municipal governments, and agricultural authorities. Our team navigates Japan's complex land rezoning processes, grid interconnection agreements, and power capacity negotiations with a speed and success rate that outside operators cannot match. This network enables us to source confirmed power and secure sites in markets where capacity is otherwise unobtainable.

Pillar 02 / EPC & Civil

Design and Construction Expertise in Utility and Civil Engineering

🏗️ Turnkey In-House EPC ⚡ HV Substation Engineering ⏱️ Fast-Track Site Delivery

Our leadership team brings decades of hands-on experience delivering large-scale utility and civil infrastructure projects across Japan — from high-voltage substation design and grid interconnection to land grading, structural engineering, and industrial facility construction. This in-house expertise allows us to manage every phase of campus development: from initial site feasibility and grid application through to building permits, civil works, and handover to tenant fit-out — all executed on compressed timelines that outpace conventional data center developers.

Pillar 03 / Modular Prefab

Data Center Modular Prefab Equipment

🏢 Prefab Data Hall Structures ❄️ Integrated Chilled Skids 🚀 6-Month Build Cycles

Grid Apex partners with leading global manufacturers of factory-built, modular data center infrastructure — including prefabricated data hall structures, power modules, chilled water skids, and pre-integrated cooling systems. These components are manufactured in parallel with on-site civil works, pre-tested in the factory, and shipped ready to connect — compressing typical 18-month build cycles to 6 months or less. This approach dramatically de-risks delivery, reduces on-site labor complexity, and enables phased capacity expansion without disrupting live operations.

Pillar 04 / Security & Compliance

Network, Application and AI Security Compliances

🛡️ ISO 27001 & SOC 2 Type II 🤖 NIST AI Risk Framework 🔒 Japan METI Compliant

Grid Apex designs its facilities and platform to meet the rigorous security and compliance requirements of enterprise AI operators and hyperscalers. Our infrastructure supports alignment with key frameworks including ISO 27001, SOC 2 Type II, NIST AI Risk Management Framework, and Japan's METI cybersecurity guidelines. From physically isolated network zones and encrypted data pathways to AI workload access controls and audit logging, we provide the compliance-ready foundation that security-sensitive tenants require — without compromising deployment speed.

Our Experience

Our team members had built prefabricated modular AIDCs in Japan, US and East South Asia, delivering projects at a unprecedented speed

🇯🇵 Osaka, Japan Osaka Data Center Project
AIDC Deployment
Osaka 2.5MW Containerized Data Center
Scale: 2.5 MW / 1,137 m²
Period: 2025.09 – 2025.12
Scope: Container-type AIDC, cooling water pipeline, PDC & automatic control panels
🇺🇸 Ohio, USA Ohio Data Center Project
Hyperscale Campus
Ohio Modular Data Center Campus
Scale: 3.64 Acres
Delivery: 2027
Scope: MEP GC, container steel roof, external walls, internal MEP/HVAC & Plumbing
🇲🇾 Johor, Malaysia Johor Bahru Data Center Campus
Prefabricated Campus
Johor Bahru 96,500m² Data Center
Scale: 96,500 m²
Period: 2023 – 2026
Scope: Module assembly, exterior roof/wall, waterproof sealing, HV&ELV, HVAC, Plumbing
🇲🇾 Johor, Malaysia Johor Bahru Prefabricated Facility
Turnkey MEP GC
Johor Bahru 67,500m² Prefab Facility
Scale: 67,500 m²
Period: 2022 – 2025
Scope: Main building, ancillary works, prefabricated AIDC, interior/exterior MEP
🇲🇾 Johor, Malaysia Johor Bahru 40MW AIDC Project
Fast-Track MEP
Johor Bahru 40MW Container AIDC
Scale: 40 MW AIDC Capacity
Delivery: December 2026
Scope: Container hoisting, equipment & MEP installation, curtain wall, joint debugging
⚙️ Global Heavy Modular Chiller & Substructure Racks
Chilled Water Plant
Heavy Modular Chiller & Rack Skids
Engineering: Pre-engineered steel module frames & rooftop chiller plant skids
🏭 Factory Off-Site Prefabricated Module Manufacturing
Factory Manufacturing
Off-Site Prefabricated Module Production
Quality: Parallel factory assembly and pre-commissioning testing
🏗️ Civil Works Structural Assembly & Crane Work
Structural Engineering
On-Site Modular Roof & Crane Assembly
Deployment: Fast-track roof superstructure and crane hoisting
❄️ Cooling Industrial Chilled Water Plant Integration
Cooling Infrastructure
Industrial Chilled Water Plant Integration
Capacity: High-density chilled water distribution deck

AI-Ready Warm Shell Leasing

We build the facility. You bring the compute. Grid Apex delivers turnkey warm-shell data center space purpose-built for AI — ready for your hardware from day one.

🏗️

AI-Ready Warm Shell

Fully built-out data center shells with high-density power, structural reinforcement, and cooling infrastructure pre-installed — ready for tenant fit-out with GPU racks and networking on move-in.

❄️

Chilled Water Infrastructure

High-capacity facility chillers and chilled water loops engineered to support tenant-installed liquid cooling systems up to 300 kW per rack.

📦

Prefab AI Factory

Modular, factory-built AI computing pods that arrive pre-wired and pre-cooled — dramatically compressing deployment timelines from 18 months to as little as 6 months.

🔋

Green Energy & Storage

On-site renewable energy generation paired with grid-scale battery storage systems, reducing grid dependency and delivering sustainable power for energy-intensive AI workloads.

100MW Power Campus

Our first campus in Japan is engineered for 100MW full load capacity with redundant utility feeds, on-site generation, and the electrical backbone to support massive GPU deployments.

🤝

Flexible Lease Terms

Custom lease structures from single halls to full campus builds, with scalable power increments — allowing tenants to grow from initial deployment to full-scale AI operations.

Why Grid Apex Is AI-First

Every design decision — from the foundation slab to the facility chilled water loops — is made with the unique demands of AI compute in mind.

01

Chilled Water Loops

Our warm shells feature pre-installed facility-level chillers and chilled water distribution loops, providing the primary cooling loop needed for high-density GPU deployment.

02

Prefabricated, Fast-Deploy Modules

Factory-built AI computing pods are manufactured in parallel with site work, pre-tested, and shipped ready to connect — compressing typical 18-month builds to 6 months or less.

03

Green Energy & Battery Storage

On-site solar, grid-scale battery systems, and Japan's renewable energy credits ensure that AI workloads run on clean power — meeting ESG requirements and reducing long-term operating costs.

04

100MW Power-Dense Foundation

Redundant utility feeds, on-site backup generation, and an electrical distribution system rated for 300 kW per rack — ensuring the campus can absorb the densest GPU hardware available today and tomorrow.

Secure Your Space in Japan's AI Future

Our first 100MW AI-ready campus is under construction. Whether you need a single hall or an entire building, let's discuss how Grid Apex can be your launchpad in Japan.